At Qwinteq, we strongly believe that every detail is important.
That's why we pay attention to even the smallest aspects of our work.
With our attention to detail, we ensure that our products and services are of the highest quality.
Take a look at all the details of the installation.
For the installation of ground screws, we hired subcontractors who specialize in that, along with testing the bearing capacity of the subsoil.
The customer wants to use a foil to prevent weeds, and the screws have been set level.
​
We began constructing the floor using SIPs panels.
​
​
The customer requested a corner window, and we had to use an iron beam due to structural requirements.
Walls were built within two days.
​
​
As a roofing foil, we used EPDM foil, which we had to let flatten for one day after unrolling, and then we glued it.
We covered the walls with a breathable membrane, which also served as a makeshift solution against the rain during the weekend.
In the inner corners, we used a special tape that had two parts to peel off.
​
All internal joints on the SIPs panels were taped with airtight tape to prevent interior moisture from entering the walls, ceiling, and floors.
The window frame has been attached to the breathable membrane with a special tape that is water and wind-resistant.
All external joints were also insulated with airtight tape.
​
Wooden cladding called Treated C16 was used as external cladding.
​
The detail of the window at the outer sill was resolved by means of moldings.
​
The customer wanted wood paneling for the interior, but they wanted it to be laid vertically.
​
In the interior, there is a wooden grate that creates space for the distribution of wiring cables.
​
The socket is hidden in the wooden grate.
​
​
The joints on the floor were also taped.
​
​
The airtight tape was connected to the previously sealed wall.
​
All joints on the floor are also sealed with tape.
​
​
The customer requested interior underfloor heating.
​
​
Laminate flooring was used as flooring.
​
​
The connection between the wall and the floor was resolved by using moldings.
​
The final surface treatment was applied using a natural oil-based solution.
​
All joints on the outer cladding were painted with a brush and then with a roller.
​
Gutter system at the back.
​
​